The technical and economic proposal focuses on the functional and structural evaluation and analysis of the pavements comprising the Green Corridor, covering several sectors with different lengths and characteristics.
The technical and economic proposal focuses on the functional and structural evaluation and analysis of the pavements comprising the Green Corridor, covering several sectors with different lengths and characteristics.
The project development presents a detailed analysis of the pavements of the Green Corridor, with a total length of 41.78 km. Through a damage inventory, deflectometry tests, and structural analyses, the pavement condition indices (PCI) will be determined and their load-bearing capacity (ACN/PCN) will be evaluated. This information will be fundamental for the planning and execution of the necessary maintenance and rehabilitation works.
El conjunto de servicios de consultoría de ingeniería de pavimentos ofrecidos por Strinso se ha ampliado significativamente durante sus años de crecimiento y hoy en día incluye:
Length per lane varies depending on the sector, with a combined total of 84.89 km (including all evaluated lanes).
41,78 km
Includes visual inspection, deflectometry measurement, remaining life analysis, and ACN/PCN analysis.
This technical and economic proposal aims to provide a detailed and precise evaluation of the Green Corridor pavements, ensuring the long-term quality and durability of the evaluated roads.